[ 
https://issues.apache.org/jira/browse/HIVE-23055?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

PRAVIN KUMAR SINHA reassigned HIVE-23055:
-----------------------------------------


> Issues when Repl dump and Repl load uses Hive Query Scheduler based execution
> -----------------------------------------------------------------------------
>
>                 Key: HIVE-23055
>                 URL: https://issues.apache.org/jira/browse/HIVE-23055
>             Project: Hive
>          Issue Type: Bug
>            Reporter: PRAVIN KUMAR SINHA
>            Assignee: PRAVIN KUMAR SINHA
>            Priority: Major
>
> When repl load and repl dump is scheduled to the the same/different scheduler 
> service, need to investigate and fix if required:
> a) Why the time taken for repl dump operation in second test seems to be 
> higher than it was in the first.
> b) The failed cases during scheduling the repl load operation are handled 
> properly.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to