[
https://issues.apache.org/jira/browse/HIVE-23203?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Miklos Gergely updated HIVE-23203:
----------------------------------
Description:
If the ptest configuration is required to be modified, then the server must be
restarted, which causes the actually processed patch to fail. In order not to
cause trouble to others, this dummy Jira can be used by queueing this first,
then the actual modification, finally the pair of this Jira.
When the patch for this one is is processed, the ptest configuration can be
modified, and the server can be restarted, thus this dummy jira's patch
processing will fail. Then the actual modification comes, which will result in
some way or the other. Then the other dummy Jira
([HIVE-23204|https://issues.apache.org/jira/browse/HIVE-23204]) comes, and the
ptest modifications can be reverted, and the server can be restarted again.
was:
If the ptest configuration is required to be modified, then the server must be
restarted, which causes the actually processed patch to fail. In order not to
cause trouble to others, this dummy Jira can be used by queueing this first,
then the actual modification, finally the pair of this Jira.
When the patch for this one is is processed, the ptest configuration can be
modified, and the server can be restarted, thus this dummy jira's patch
processing will fail. Then the actual modification comes, which will result in
some way or the other. Then the other dummy Jira comes, and the ptest
modifications can be reverted, and the server can be restarted again.
> Dummy jira for modifying ptest configuration - before the actual patch
> ----------------------------------------------------------------------
>
> Key: HIVE-23203
> URL: https://issues.apache.org/jira/browse/HIVE-23203
> Project: Hive
> Issue Type: Test
> Components: Hive
> Reporter: Miklos Gergely
> Priority: Major
>
> If the ptest configuration is required to be modified, then the server must
> be restarted, which causes the actually processed patch to fail. In order not
> to cause trouble to others, this dummy Jira can be used by queueing this
> first, then the actual modification, finally the pair of this Jira.
> When the patch for this one is is processed, the ptest configuration can be
> modified, and the server can be restarted, thus this dummy jira's patch
> processing will fail. Then the actual modification comes, which will result
> in some way or the other. Then the other dummy Jira
> ([HIVE-23204|https://issues.apache.org/jira/browse/HIVE-23204]) comes, and
> the ptest modifications can be reverted, and the server can be restarted
> again.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)