[ 
https://issues.apache.org/jira/browse/HIVE-11652?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15766626#comment-15766626
 ] 

Jesus Camacho Rodriguez commented on HIVE-11652:
------------------------------------------------

[~dhiraj.kumar], thanks for the feedback.

FWIW, when we worked on this patch, we focused on the _removeAll_ call because 
it was causing slowness for many queries. We run tests on multiple workloads 
w/o the patch, and we did not observe performance regression wrt previous 
version. However, it is indeed possible that our queries were not covering all 
possible cases.

The performance of the algorithm could be improved by storing the position of 
the last added child to the stack. However, this will impact the memory 
footprint too, as we will need to store an integer per AST node in the stack. I 
think that is acceptable, but we just should be aware that there is a trade-off 
here.

I would suggest you open a new JIRA case pointing to this one, describe the 
problem, and provide some query where this issue is noticeable so we can 
reproduce the issue in a different environment. If you have a clear idea on the 
solution, you could contribute a patch. Otherwise, I will try to look into the 
issue asap.

--

Btw, wrt 3., have you set _hive.driver.parallel.compilation_ to _true_? That 
should at least prevent the locking issue.

> Avoid expensive call to removeAll in DefaultGraphWalker
> -------------------------------------------------------
>
>                 Key: HIVE-11652
>                 URL: https://issues.apache.org/jira/browse/HIVE-11652
>             Project: Hive
>          Issue Type: Bug
>          Components: Logical Optimizer, Physical Optimizer
>    Affects Versions: 1.3.0, 2.0.0
>            Reporter: Jesus Camacho Rodriguez
>            Assignee: Jesus Camacho Rodriguez
>             Fix For: 1.3.0, 2.0.0
>
>         Attachments: HIVE-11652.01.patch, HIVE-11652.02.patch, 
> HIVE-11652.patch
>
>
> When the plan is too large, the removeAll call in DefaultGraphWalker (line 
> 140) will take very long as it will have to go through the list looking for 
> each of the nodes. We try to get rid of this call by rewriting the logic in 
> the walker.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to