[
https://issues.apache.org/jira/browse/HIVE-15448?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15781479#comment-15781479
]
Hive QA commented on HIVE-15448:
--------------------------------
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12844827/HIVE-15448.4.patch
{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.
{color:red}ERROR:{color} -1 due to 4 failed/errored test(s), 10899 tests
executed
*Failed tests:*
{noformat}
TestDerbyConnector - did not produce a TEST-*.xml file (likely timed out)
(batchId=234)
org.apache.hadoop.hive.cli.TestMiniLlapCliDriver.testCliDriver[orc_ppd_basic]
(batchId=134)
org.apache.hadoop.hive.cli.TestMiniLlapCliDriver.testCliDriver[orc_ppd_schema_evol_3a]
(batchId=135)
org.apache.hive.hcatalog.pig.TestHCatLoaderComplexSchema.testTupleInBagInTupleInBag[1]
(batchId=173)
{noformat}
Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/2732/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/2732/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-2732/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 4 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12844827 - PreCommit-HIVE-Build
> ChangeManager for replication
> -----------------------------
>
> Key: HIVE-15448
> URL: https://issues.apache.org/jira/browse/HIVE-15448
> Project: Hive
> Issue Type: Sub-task
> Components: repl
> Reporter: Daniel Dai
> Assignee: Daniel Dai
> Attachments: HIVE-15448.1.patch, HIVE-15448.2.patch,
> HIVE-15448.4.patch
>
>
> The change manager implementation as described in
> https://cwiki.apache.org/confluence/display/Hive/HiveReplicationv2Development#HiveReplicationv2Development-Changemanagement.
> This issue tracks the infrastructure code. Hooking to actions will be
> tracked in other ticket.
> ReplChangeManager includes:
> * method to generate checksum
> * method to convert file path to cm path
> * method to move table/partition/file into cm
> * thread to clear cm files if expires
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)