[
https://issues.apache.org/jira/browse/HIVE-15891?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15873928#comment-15873928
]
Hive QA commented on HIVE-15891:
--------------------------------
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12853503/HIVE-15891.4.patch
{color:green}SUCCESS:{color} +1 due to 3 test(s) being added or modified.
{color:red}ERROR:{color} -1 due to 9 failed/errored test(s), 10249 tests
executed
*Failed tests:*
{noformat}
TestDerbyConnector - did not produce a TEST-*.xml file (likely timed out)
(batchId=235)
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver[cbo_rp_auto_join1]
(batchId=3)
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver[interval_arithmetic]
(batchId=43)
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver[join31] (batchId=81)
org.apache.hadoop.hive.cli.TestEncryptedHDFSCliDriver.testCliDriver[encryption_join_with_different_encryption_keys]
(batchId=159)
org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[multiMapJoin2]
(batchId=152)
org.apache.hadoop.hive.cli.TestPerfCliDriver.testCliDriver[query14]
(batchId=223)
org.apache.hadoop.hive.cli.TestSparkCliDriver.testCliDriver[join31]
(batchId=133)
org.apache.hive.beeline.TestBeeLineWithArgs.testQueryProgressParallel
(batchId=211)
{noformat}
Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/3653/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/3653/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-3653/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 9 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12853503 - PreCommit-HIVE-Build
> Detect query rewrite scenario for UPDATE/DELETE/MERGE and fail fast
> -------------------------------------------------------------------
>
> Key: HIVE-15891
> URL: https://issues.apache.org/jira/browse/HIVE-15891
> Project: Hive
> Issue Type: Bug
> Components: Transactions
> Affects Versions: 2.2.0
> Reporter: Wei Zheng
> Assignee: Wei Zheng
> Attachments: HIVE-15891.1.patch, HIVE-15891.2.patch,
> HIVE-15891.3.patch, HIVE-15891.4.patch
>
>
> Currently ACID UpdateDeleteSemanticAnalyzer directly manipulates the AST tree
> but it's different from the general approach of modifying the token stream
> and thus will cause AST tree mismatch if there is any rewrite happening after
> UpdateDeleteSemanticAnalyzer.
> The long term solution will be to rewrite the AST handling logic in
> UpdateDeleteSemanticAnalyzer, to make it consistent with the general approach.
> This ticket will for now detect the error prone cases and fail early.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)