imbajin opened a new pull request, #3353:
URL: https://github.com/apache/hugegraph/pull/3353

   ## Purpose of the PR
   
   The PD log tests query up to the current millisecond using an exclusive end 
bound. A log inserted in that same millisecond is correctly excluded, making 
the test occasionally report zero records instead of one. Both tests now 
include the current millisecond and report expected/actual values in the 
correct order.
   
   ## Main Changes
   
   - Move the two test query endpoints one millisecond past the current time.
   - Add a fixed-timestamp RocksDB regression for the inclusive start and 
exclusive end.
   - Keep production log query and scan semantics unchanged.
   
   ## Verifying these changes
   
   - [x] Need tests and can be verified as follows:
   
   Java 17 formatting and clean reactor compilation pass. The new RocksDB 
boundary regression passes without starting a service or opening a listener. 
The original Raft/REST-dependent suites were not run locally; their deployment 
validation remains separate.
   
   ## Does this PR potentially affect the following parts?
   
   - [ ] Dependencies
   - [ ] Modify configurations
   - [ ] The public API
   - [ ] Other affects
   - [x] Nope
   
   ## Documentation Status
   
   - [ ] `Doc - TODO`
   - [ ] `Doc - Done`
   - [x] `Doc - No Need`: tests only; production behavior is unchanged.
   


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]


---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to