[ 
https://issues.apache.org/jira/browse/IGNITE-13591?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Ilya Kazakov reassigned IGNITE-13591:
-------------------------------------

    Assignee: Ilya Kazakov

> Add getLastCheckpointStarted metric
> -----------------------------------
>
>                 Key: IGNITE-13591
>                 URL: https://issues.apache.org/jira/browse/IGNITE-13591
>             Project: Ignite
>          Issue Type: Improvement
>            Reporter: Ilya Kazakov
>            Assignee: Ilya Kazakov
>            Priority: Major
>
> Sometimes one needs to understand how long ago did the last checkpoint start 
> or end, how long was it, etc. There is lastCheckpointDuration already - let’s 
> add lastCheckpointStarted timestamp. From these two metrics the user can also 
> figure out started + duration = ended and now - ended = time without cp.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to