[
https://issues.apache.org/jira/browse/IGNITE-13591?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17223176#comment-17223176
]
Andrey N. Gura commented on IGNITE-13591:
-----------------------------------------
[~kazakov], I've left some comments to the PR. Please, check this out.
PS: If you have PR which is ready for review, you should change status to the
"Path available".
> Add getLastCheckpointStarted metric
> -----------------------------------
>
> Key: IGNITE-13591
> URL: https://issues.apache.org/jira/browse/IGNITE-13591
> Project: Ignite
> Issue Type: Improvement
> Reporter: Ilya Kazakov
> Assignee: Ilya Kazakov
> Priority: Major
> Time Spent: 20m
> Remaining Estimate: 0h
>
> Sometimes one needs to understand how long ago did the last checkpoint start
> or end, how long was it, etc. There is lastCheckpointDuration already - let’s
> add lastCheckpointStarted timestamp. From these two metrics the user can also
> figure out started + duration = ended and now - ended = time without cp.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)