[ 
https://issues.apache.org/jira/browse/IGNITE-19831?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Aleksandr Polovtcev updated IGNITE-19831:
-----------------------------------------
    Description: {{RaftManager#startRaftGroupNode}} with 4 parameters is 
different from its overloads: it actually blocks until the Raft log is applied, 
which exactly what {{startRaftGroupNodeAndWaitNodeReadyFuture}} methods do. 
This method must be renamed.

> Cleanup RaftManager methods
> ---------------------------
>
>                 Key: IGNITE-19831
>                 URL: https://issues.apache.org/jira/browse/IGNITE-19831
>             Project: Ignite
>          Issue Type: Task
>            Reporter: Aleksandr Polovtcev
>            Assignee: Aleksandr Polovtcev
>            Priority: Major
>              Labels: ignite-3
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> {{RaftManager#startRaftGroupNode}} with 4 parameters is different from its 
> overloads: it actually blocks until the Raft log is applied, which exactly 
> what {{startRaftGroupNodeAndWaitNodeReadyFuture}} methods do. This method 
> must be renamed.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to