[
https://issues.apache.org/jira/browse/IGNITE-19831?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Aleksandr Polovtcev updated IGNITE-19831:
-----------------------------------------
Description: {{RaftManager#startRaftGroupNode}} with 4 parameters is
different from its overloads: it actually blocks until the Raft log is applied,
which exactly what {{startRaftGroupNodeAndWaitNodeReadyFuture}} methods do.
This method must be renamed.
> Cleanup RaftManager methods
> ---------------------------
>
> Key: IGNITE-19831
> URL: https://issues.apache.org/jira/browse/IGNITE-19831
> Project: Ignite
> Issue Type: Task
> Reporter: Aleksandr Polovtcev
> Assignee: Aleksandr Polovtcev
> Priority: Major
> Labels: ignite-3
> Time Spent: 10m
> Remaining Estimate: 0h
>
> {{RaftManager#startRaftGroupNode}} with 4 parameters is different from its
> overloads: it actually blocks until the Raft log is applied, which exactly
> what {{startRaftGroupNodeAndWaitNodeReadyFuture}} methods do. This method
> must be renamed.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)