[ 
https://issues.apache.org/jira/browse/IGNITE-29125?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Nikita Amelchev updated IGNITE-29125:
-------------------------------------
    Fix Version/s: 2.19

> Fix a false critical failure of a coordinator stopped during an exchange
> ------------------------------------------------------------------------
>
>                 Key: IGNITE-29125
>                 URL: https://issues.apache.org/jira/browse/IGNITE-29125
>             Project: Ignite
>          Issue Type: Bug
>            Reporter: Nikita Amelchev
>            Assignee: Nikita Amelchev
>            Priority: Minor
>             Fix For: 2.19
>
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> When a node becomes the new coordinator of an unfinished exchange and is 
> stopped at the same moment, the restore-state request to a remote node fails 
> because the local communication SPI has already been stopped. The failure is 
> reported as a critical error although the node is shutting down on purpose, 
> so the failure handler starts a second stop and, with the default handler, 
> may halt the JVM on the stop timeout. This also makes 
> {{TcpDiscoveryClientTopologyGapTest}} 
> [flaky|https://ci2.ignite.apache.org/test/-2566039099717671418?currentProjectId=IgniteTests24Java8].



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to