[
https://issues.apache.org/jira/browse/IGNITE-29125?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Nikita Amelchev updated IGNITE-29125:
-------------------------------------
Fix Version/s: 2.19
> Fix a false critical failure of a coordinator stopped during an exchange
> ------------------------------------------------------------------------
>
> Key: IGNITE-29125
> URL: https://issues.apache.org/jira/browse/IGNITE-29125
> Project: Ignite
> Issue Type: Bug
> Reporter: Nikita Amelchev
> Assignee: Nikita Amelchev
> Priority: Minor
> Fix For: 2.19
>
> Time Spent: 10m
> Remaining Estimate: 0h
>
> When a node becomes the new coordinator of an unfinished exchange and is
> stopped at the same moment, the restore-state request to a remote node fails
> because the local communication SPI has already been stopped. The failure is
> reported as a critical error although the node is shutting down on purpose,
> so the failure handler starts a second stop and, with the default handler,
> may halt the JVM on the stop timeout. This also makes
> {{TcpDiscoveryClientTopologyGapTest}}
> [flaky|https://ci2.ignite.apache.org/test/-2566039099717671418?currentProjectId=IgniteTests24Java8].
--
This message was sent by Atlassian Jira
(v8.20.10#820010)