[
https://issues.apache.org/jira/browse/IGNITE-7406?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Ksenia Rybakova updated IGNITE-7406:
------------------------------------
Attachment: run-load.xml
run-load.properties
ignite-base-load-config.xml
IGNITE-7406_hungTx.log
> Transactions hang forever during load test
> ------------------------------------------
>
> Key: IGNITE-7406
> URL: https://issues.apache.org/jira/browse/IGNITE-7406
> Project: Ignite
> Issue Type: Bug
> Affects Versions: 2.3
> Reporter: Ksenia Rybakova
> Priority: Critical
> Attachments: IGNITE-7406_hungTx.log, ignite-base-load-config.xml,
> run-load.properties, run-load.xml
>
>
> Load test config:
> - CacheRandomOperationBenchmark
> - 13 client nodes (1 per host), 62 server nodes (4 per host)
> - 30 caches with different configs
> - data store config: 6Gb default region, two 100M regions, two 1Gb regions
> - operations: PUT PUT_ALL GET GET_ALL INVOKE INVOKE_ALL REMOVE REMOVE_ALL
> PUT_IF_ABSENT REPLACE
> - preload amount 200K entries, key range 400K
> - Persistent store is disabled
> Preloading phase completed successfully, but during main test transactions
> completely hang ("long running tx/cache future" logs show duration more than
> 48h) after some time.
> Yardstick configs are attached, "long running tx/cache future" messages from
> one of the server are attached.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)