[
https://issues.apache.org/jira/browse/IGNITE-9195?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16572978#comment-16572978
]
Pavel Pereslegin commented on IGNITE-9195:
------------------------------------------
Hello [~dpavlov],
as I see, tests suite "PDS 2 direct IO" completes much faster, so I think we
can keep it unchanged for a while.
p.s. "Real page store tests" included in "PDS 2 direct IO" remain in the "PDS
2" suite.
> Split PDS 2 TC configuration.
> -----------------------------
>
> Key: IGNITE-9195
> URL: https://issues.apache.org/jira/browse/IGNITE-9195
> Project: Ignite
> Issue Type: Improvement
> Reporter: Pavel Pereslegin
> Assignee: Pavel Pereslegin
> Priority: Major
> Fix For: 2.7
>
>
> PDS 2 TC configuration takes too long time to complete (avg >2h) and should
> be split into two.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)