[ 
https://issues.apache.org/jira/browse/IGNITE-10153?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Dmitriy Pavlov updated IGNITE-10153:
------------------------------------
    Ignite Flags:   (was: Docs Required)

> [TC Bot] Implement tests running time report
> --------------------------------------------
>
>                 Key: IGNITE-10153
>                 URL: https://issues.apache.org/jira/browse/IGNITE-10153
>             Project: Ignite
>          Issue Type: Task
>            Reporter: Sergey Chugunov
>            Assignee: Sergey Chugunov
>            Priority: Major
>
> In order to optimize running time of existing test base (at the moment all 
> tests require ~ 50 hours of running time on available agents) we need a 
> report page with info about each suite.
> At the first stage page will show tests running longer than 1 minute for each 
> suite in the latest run in master branch.
> Later other features may be added like analyzing PRs or other branches, 
> adjusting running time limit (e.g. all tests longer than 30 seconds and so 
> on).



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to