Csaba Ringhofer created IMPALA-9689: ---------------------------------------
Summary: Consider moving some tests before data load Key: IMPALA-9689 URL: https://issues.apache.org/jira/browse/IMPALA-9689 Project: IMPALA Issue Type: Improvement Components: Infrastructure Reporter: Csaba Ringhofer Currently all tests run only after a successful data load, which is problematic because: - broken data load leads to not executing the tests at all, so hides other issues than the one that data load bumps into first - and data load is fairly complex, relying on functionality from several components (Impala/HMS/Hive server/HDFS/HBase/Kudu) so it can be broken easily, especially when we change the versions of dependencies We could create a small test suite (e.g. "smoke") that runs before data load, or runs even if data load failed. Any test that creates its own tables and doesn't rely on functional/tpch/tpcds is suitable. Probably the most critical area is interoperability with Hive, e.g. creating table in Hive and reading it with Impala. -- This message was sent by Atlassian Jira (v8.3.4#803005)