https://bz.apache.org/bugzilla/show_bug.cgi?id=60104

            Bug ID: 60104
           Summary: SetUp and TearDown at Thead group level
           Product: JMeter
           Version: 3.0
          Hardware: PC
                OS: Linux
            Status: NEW
          Severity: enhancement
          Priority: P2
         Component: Main
          Assignee: [email protected]
          Reporter: [email protected]

Hi, 

Currently,Tear down and set-up is executed at pre and post execution of all
thread group. The purpose of thread group is to set-up or clear the resources. 

In load testing or functional testing, set-up or clear the resources also
required at thread group level. 

this can be done through a sampler, But in this case, many problems occurred. 
1) For clean-up purpose, I have to continue test plan even if it fails.
2) By looking at test, I can not say that which are my test step and which are
my clean-up and set-up steps.

-- 
You are receiving this mail because:
You are the assignee for the bug.

Reply via email to