[ 
https://issues.apache.org/jira/browse/KARAF-5107?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jean-Baptiste Onofré resolved KARAF-5107.
-----------------------------------------
    Resolution: Fixed

> Allow hooking into the feature installation process
> ---------------------------------------------------
>
>                 Key: KARAF-5107
>                 URL: https://issues.apache.org/jira/browse/KARAF-5107
>             Project: Karaf
>          Issue Type: New Feature
>          Components: karaf-feature
>    Affects Versions: 4.0.9, 4.1.1
>            Reporter: Robert Varga
>            Assignee: Jean-Baptiste Onofré
>             Fix For: 4.2.0, 4.1.2
>
>
> Feature service should expose a way to hook into the feature:install process, 
> so components living inside container can understand when a bulk bundle 
> operation starts, ends and reaches a major milestone.
> This ability is needed to optimize OpenDaylight startup/shutdown procedures, 
> as exemplified by https://bugs.opendaylight.org/show_bug.cgi?id=7925 and 
> https://bugs.opendaylight.org/show_bug.cgi?id=7927. In these cases we are 
> scanning deployed bundles  for well-known file locations as the bundles get 
> resolved. These files are then used to compile the effective model of the 
> run-time world (which is an expensive operation).
> Since there is no way to understand that an install transaction is going on, 
> the model is invalidated whenever a bundle is resolved and or stopped, 
> leading to multiple compilations (and oftentime failures, as all requirements 
> are not yet met) during a single feature:install invocation or framework 
> shutdown.
> This requires having callbacks invoked from Deployer.deploy() for:
> 1) just before any bundle operations are performed
> 2) once all bundles have been resolved, but not started
> 3) once the operation completes and before the next bundle movement starts
>  



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to