[ 
https://issues.apache.org/jira/browse/KUDU-1583?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Todd Lipcon deleted KUDU-1583:
------------------------------


> maintenance manager scheduling very slow on TS with lots of data
> ----------------------------------------------------------------
>
>                 Key: KUDU-1583
>                 URL: https://issues.apache.org/jira/browse/KUDU-1583
>             Project: Kudu
>          Issue Type: Bug
>            Reporter: Todd Lipcon
>
> On a server with ~5.5TB of data, the maintenance manager scheduler thread has 
> gotten quite slow. The thread takes many tens of seconds to pick a 
> maintenance operation, and then the actual operations take only a few seconds 
> to run. So, the actual "duty cycle" of those threads is quite low, and 
> compaction/flushing falls behind.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to