Rahul Choubey created KYLIN-1886:
------------------------------------
Summary: When the calculation on measures is supported on Kylin?
Key: KYLIN-1886
URL: https://issues.apache.org/jira/browse/KYLIN-1886
Project: Kylin
Issue Type: Test
Reporter: Rahul Choubey
Suppose we have two measures and we want to do some calculation on the top of
these measures instead of doing it on the fly in the sql query after the cube
got build? Currently it does not supported in Kylin and in which version we are
planning to have these feature?
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)