[ 
https://issues.apache.org/jira/browse/KYLIN-2802?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Zhong Yanghong updated KYLIN-2802:
----------------------------------
    Description: 
This phase happens at cube building. To trigger cube planner, one of the 
following conditions should be satisfied.
* The cube is empty
* Job is for refreshing the only one segment.

Since cube planner is based on cuboid row count, if the first segment is empty 
and there's no useful row count info, cube planner should not be triggered in 
this phase.

> Enable cube planner phase one
> -----------------------------
>
>                 Key: KYLIN-2802
>                 URL: https://issues.apache.org/jira/browse/KYLIN-2802
>             Project: Kylin
>          Issue Type: Sub-task
>            Reporter: Zhong Yanghong
>            Assignee: Zhong Yanghong
>             Fix For: v2.2.0
>
>
> This phase happens at cube building. To trigger cube planner, one of the 
> following conditions should be satisfied.
> * The cube is empty
> * Job is for refreshing the only one segment.
> Since cube planner is based on cuboid row count, if the first segment is 
> empty and there's no useful row count info, cube planner should not be 
> triggered in this phase.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to