[ 
https://issues.apache.org/jira/browse/KYLIN-3078?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Yifei Wu updated KYLIN-3078:
----------------------------
    Description: To set a shard number that will be for controlling the size 
per shard  properly, we need to estimate cube size through accumulating all 
dimension and measure size roughly before  building cube.  (was: To set a shard 
number that will be for controlling the size per shard  properly, we need to 
estimate cube size through accumulating all dimension and measure size roughly 
before  building cube )

> the estimated size of percentile measure  is too big
> ----------------------------------------------------
>
>                 Key: KYLIN-3078
>                 URL: https://issues.apache.org/jira/browse/KYLIN-3078
>             Project: Kylin
>          Issue Type: Bug
>            Reporter: Yifei Wu
>            Assignee: Yifei Wu
>            Priority: Critical
>
> To set a shard number that will be for controlling the size per shard  
> properly, we need to estimate cube size through accumulating all dimension 
> and measure size roughly before  building cube.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to