[
https://issues.apache.org/jira/browse/KYLIN-2732?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16275899#comment-16275899
]
Zhong Yanghong commented on KYLIN-2732:
---------------------------------------
Both raw data & base cuboid data can be cubing source.
> Introduce base cuboid as a new input for cubing job
> ---------------------------------------------------
>
> Key: KYLIN-2732
> URL: https://issues.apache.org/jira/browse/KYLIN-2732
> Project: Kylin
> Issue Type: Sub-task
> Reporter: Zhong Yanghong
> Assignee: Zhong Yanghong
> Fix For: v2.3.0
>
>
> If the design for an existing cube is not good, which means its prebuilt
> cuboid set is not suitable for query, there should be a way to adjust this
> cuboid set. This is phase two of cube planner, also called cube optimization.
> Its data source should be base cuboid rather than the original data source,
> like hive, for the original one may be changed. Thus for cubing jobs, like
> cube optimization, we introduce a new input , base cuboid formatted by
> sequence file.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)