[
https://issues.apache.org/jira/browse/KYLIN-3357?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Shaofeng SHI reassigned KYLIN-3357:
-----------------------------------
Assignee: hongbin ma
> Sum of small int measure may be nagetive after KYLIN-2982
> ---------------------------------------------------------
>
> Key: KYLIN-3357
> URL: https://issues.apache.org/jira/browse/KYLIN-3357
> Project: Kylin
> Issue Type: Bug
> Components: Query Engine
> Affects Versions: v2.3.0
> Reporter: Liu Shaohui
> Assignee: hongbin ma
> Priority: Critical
>
> After KYLIN-2982, the sum of small int measure may be nagetive.
> Same problem is reported in kylin user mail with title "negative result in
> kylin 2.3.0"
>
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)