nichunen updated KYLIN-3371:
----------------------------
    Labels: newbie  (was: )

> Increase of time between steps after Kylin 2.3.1 update
> -------------------------------------------------------
>
>                 Key: KYLIN-3371
>                 URL: https://issues.apache.org/jira/browse/KYLIN-3371
>             Project: Kylin
>          Issue Type: Bug
>          Components: Job Engine
>    Affects Versions: v2.3.1
>         Environment: -EMR 5.7 (S3 storage for Hive and HBase)
> -Kylin 2.3.1 (updated from 2.2). Deployed on separated EC2 instance.
>            Reporter: Roberto Tardío Olmos
>            Priority: Major
>              Labels: newbie
>             Fix For: Backlog
>
>         Attachments: Screenshot1.png, Screenshot2.png
>
>
> Hi,
> We have updated from Kylin 2.2 to Kylin 2.3.1. We performed the update 
> process with successful. However, we have experimented an increase of time 
> wasted between steps during building time. For example, the time between step 
> 7 “Build N-Dimension Cuboid:level 1” and “…level2” is now about 30 seconds, a 
> lot of time if we take into account that in these steps no processing is 
> executed since we use the "layer" algorithm (Screenshot 1). This time between 
> steps is much longer than when we used Kylin 2.2, were average time was about 
> 5 seconds. (Screenshot 2).
> Could it be related to a change in the code? The configuration we use in 
> Kylin 2.3.1 is the same as we used in Kylin 2.2. I have considered this JIRA 
> as a possible BUG.
> Thanks in advance,
>  
> Screenshot 1:
> !Screenshot1.png!
>  
> Screenshot 2
>  
> !Screenshot2.png!
>  
>  
> A sample of the generated log.
> Kylin 2.2
>  
> 2018-05-04 14:25:40,797 INFO  [Scheduler 542798956 Job 
> cb843ecc-5062-49ec-a881-215097e4501a-518] execution.ExecutableManager:421 : 
> job id:cb843ecc-5062-49ec-a881-215097e4501a from RUNNING to READY
> 2018-05-04 14:25:45,496 INFO  [Scheduler 542798956 Job 
> cb843ecc-5062-49ec-a881-215097e4501a-518] execution.AbstractExecutable:111 : 
> Executing AbstractExecutable (BUILD CUBE - Captacion_Resumido_Cubo_v3 - 
> 20180504000000_20180505000000 - GMT+02:00 2018-05-04 14:21:34)
>  
> Kylin 2.3.1
>  
> 2018-05-07 15:25:26,338 INFO  [Scheduler 1942482192 Job 
> 6d616841-1c4d-46ca-a1b9-a18047fbada5-1006] execution.ExecutableManager:411 : 
> job id:6d616841-1c4d-46ca-a1b9-a18047fbada5 from RUNNING to READY
> 2018-05-07 {color:#FF0000}15:25:48,365{color} INFO  [Scheduler 1942482192 Job 
> 6d616841-1c4d-46ca-a1b9-a18047fbada5-1006] execution.AbstractExecutable:147 : 
> Executing AbstractExecutable (BUILD CUBE - Captacion_Resumido_Cubo_v3 - 
> 20180507000000_20180508000000 - GMT+02:00 2018-05-07 15:19:41)



--