[
http://jira.codehaus.org/browse/MNG-3566?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=139921#action_139921
]
Joerg Schaible commented on MNG-3566:
-------------------------------------
Concerning "extreme" ... the complete dependency calculation has been changed
in point releases. Regarding LC the "process-test-classes" phase has been added
with 2.0.5, the phases "pre/post-intergation-test" have been added for 2.0.2.
As long as a change does not affect backward compatibility I cannot see a
problem with it.
> Phase prepare-package not available
> -----------------------------------
>
> Key: MNG-3566
> URL: http://jira.codehaus.org/browse/MNG-3566
> Project: Maven 2
> Issue Type: Bug
> Components: Plugins and Lifecycle
> Affects Versions: 2.0.9
> Reporter: Joerg Schaible
> Fix For: 2.0.10
>
>
> The default lifecycle contains a phase prepare-package (according to
> http://maven.apache.org/guides/introduction/introduction-to-the-lifecycle.html).
> This is not available for M209, the component.xml in maven-core misses this
> phase for the 2.0.x series.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira