[
http://jira.codehaus.org/browse/SUREFIRE-520?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Kristian Rosenvold closed SUREFIRE-520.
---------------------------------------
Resolution: Won't Fix
http://mail-archives.apache.org/mod_mbox/maven-dev/201101.mbox/%3C1295866251.13332.27.camel@chunky%3E
> Multiple test passes with difference in fail on error
> -----------------------------------------------------
>
> Key: SUREFIRE-520
> URL: http://jira.codehaus.org/browse/SUREFIRE-520
> Project: Maven Surefire
> Issue Type: Wish
> Components: JUnit 3.x support
> Affects Versions: 2.4.3
> Environment: Win2k3
> Reporter: Kevin Wilson
>
> Not sure if this is possible with the current version or not, But looking for
> a way to manage the execution o fthe tests.
> The following is the scenario. I am developing a project with agile methods
> and tdd.
> We would like to be able to define the tests that need to run early in our
> sprint. And get them checked in even before they are passing. However, we do
> not want these new tests to cause the build to fail. At the same time, there
> may be historical tests that need to continue to run, and if fail cause the
> build to fail. At the end of our sprint, we would like to move the tests
> created into the Regressions suite so that these then cause build failrues. I
> can do one or the other now in the current environment.
> How can I instrument this situation, is it possible with the current versions
> of the tools.
> Any help that can be given, on direction in the current version would be
> helpful.
> For example: if we have the following Junit test configuration.
> Current.java - Current Test Suite (fail on error false)
> - Sprint3.java - Sprint 3 test suite
> TestFeature 3 - test case for feature 3
> Regression.java - Regression Test Suite (fail on error true)
> - Sprint2.java - Sprint 2 test suite
> TestFeature2 - TestCase for feature 2
> - Sprint1.java - Sprint 1 test sutie
> TestFeature1 - TestCase for feature 1;
> At the end of the sprint we would like to create a new Sprint4 and then move
> the sprint3 suite to the Regression suite.
> Thanks,
> Kevin
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira