[ 
https://issues.apache.org/jira/browse/MESOS-4341?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15093931#comment-15093931
 ] 

Ian Babrou commented on MESOS-4341:
-----------------------------------

I have them in 0.25 and I remember having them for a looong time.

> Break up used / allocated / available resources
> -----------------------------------------------
>
>                 Key: MESOS-4341
>                 URL: https://issues.apache.org/jira/browse/MESOS-4341
>             Project: Mesos
>          Issue Type: Improvement
>          Components: webui
>            Reporter: Ian Babrou
>         Attachments: Screen Shot 2016-01-12 at 8.51.39 PM.png, really.png
>
>
> Used / allocated naming is very inconsistent now. Sometimes allocated means 
> allocated, sometimes "total available": http://imgur.com/zLEX5pU
> I propose to have the following:
> * used / allocated for each framework and task
> * user / allocated / total for each slave and for cluster as a whole
> Master now shows idle and offered, slaves have "slack" capacity too that 
> might be used for preemptive tasks. Not sure if it should be visualized as 
> well.
> It looks like fetching cluster-wide utilization requires fetching stats from 
> each slave, so it can be added separately later.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to