Anand Mazumdar created MESOS-5359:
-------------------------------------
Summary: The scheduler library should have a delay before
initiating a connection with master.
Key: MESOS-5359
URL: https://issues.apache.org/jira/browse/MESOS-5359
Project: Mesos
Issue Type: Bug
Affects Versions: 0.29.0
Reporter: Anand Mazumdar
Currently, the scheduler library does have an artificially induced delay when
trying to initially establish a connection with the master. In the event of a
master failover or ZK disconnect, a large number of frameworks can get
disconnected and then thereby overwhelm the master with TCP SYN requests.
On a large cluster with many agents, the master is already overwhelmed with
handling connection requests from the agents. This compounds the issue further
on the master.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)