[ 
https://issues.apache.org/jira/browse/MESOS-5359?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

José Guilherme Vanz reassigned MESOS-5359:
------------------------------------------

    Assignee: José Guilherme Vanz

> The scheduler library should have a delay before initiating a connection with 
> master.
> -------------------------------------------------------------------------------------
>
>                 Key: MESOS-5359
>                 URL: https://issues.apache.org/jira/browse/MESOS-5359
>             Project: Mesos
>          Issue Type: Bug
>    Affects Versions: 0.29.0
>            Reporter: Anand Mazumdar
>            Assignee: José Guilherme Vanz
>              Labels: mesosphere
>
> Currently, the scheduler library does have an artificially induced delay when 
> trying to initially establish a connection with the master. In the event of a 
> master failover or ZK disconnect, a large number of frameworks can get 
> disconnected and then thereby overwhelm the master with TCP SYN requests. 
> On a large cluster with many agents, the master is already overwhelmed with 
> handling connection requests from the agents. This compounds the issue 
> further on the master.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to