[
https://issues.apache.org/jira/browse/MESOS-5359?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
José Guilherme Vanz reassigned MESOS-5359:
------------------------------------------
Assignee: José Guilherme Vanz
> The scheduler library should have a delay before initiating a connection with
> master.
> -------------------------------------------------------------------------------------
>
> Key: MESOS-5359
> URL: https://issues.apache.org/jira/browse/MESOS-5359
> Project: Mesos
> Issue Type: Bug
> Affects Versions: 0.29.0
> Reporter: Anand Mazumdar
> Assignee: José Guilherme Vanz
> Labels: mesosphere
>
> Currently, the scheduler library does have an artificially induced delay when
> trying to initially establish a connection with the master. In the event of a
> master failover or ZK disconnect, a large number of frameworks can get
> disconnected and then thereby overwhelm the master with TCP SYN requests.
> On a large cluster with many agents, the master is already overwhelmed with
> handling connection requests from the agents. This compounds the issue
> further on the master.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)