[
https://issues.apache.org/jira/browse/MESOS-5930?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Lukas Loesche updated MESOS-5930:
---------------------------------
Description:
On my cluster I have 111 Orphan Tasks of which some are RUNNING some are
FINISHED and some are FAILED. When I open the task details for a FINISHED tasks
the following page shows a state of TASK_FINISHED and likewise when I open a
FAILED task the details page shows TASK_FAILED.
However when I open the details for the RUNNING tasks they all have a task
state of TASK_FINISHED. None of them is in state TASK_RUNNING.
was:
On my cluster I have 111 Orphan Tasks of which some are RUNNING some are
FINISHED and some are FAILED. However when I open the details for the RUNNING
tasks they too have a task state of TASK_FINISHED. None of them is in state
TASK_RUNNING.
> Orphan tasks shown as RUNNING are actually FINISHED
> ---------------------------------------------------
>
> Key: MESOS-5930
> URL: https://issues.apache.org/jira/browse/MESOS-5930
> Project: Mesos
> Issue Type: Bug
> Components: master
> Affects Versions: 1.0.0
> Reporter: Lukas Loesche
> Attachments: Screen Shot 2016-07-29 at 19.23.49.png, Screen Shot
> 2016-07-29 at 19.24.03.png, orphan-running.txt
>
>
> On my cluster I have 111 Orphan Tasks of which some are RUNNING some are
> FINISHED and some are FAILED. When I open the task details for a FINISHED
> tasks the following page shows a state of TASK_FINISHED and likewise when I
> open a FAILED task the details page shows TASK_FAILED.
> However when I open the details for the RUNNING tasks they all have a task
> state of TASK_FINISHED. None of them is in state TASK_RUNNING.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)