[ 
https://issues.apache.org/jira/browse/MESOS-5930?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Lukas Loesche updated MESOS-5930:
---------------------------------
    Description: 
On my cluster I have 111 Orphan Tasks of which some are RUNNING some are 
FINISHED and some are FAILED. When I open the task details for a FINISHED tasks 
the following page shows a state of TASK_FINISHED and likewise when I open a 
FAILED task the details page shows TASK_FAILED.

However when I open the details for the RUNNING tasks they all have a task 
state of TASK_FINISHED. None of them is in state TASK_RUNNING.


  was:
On my cluster I have 111 Orphan Tasks of which some are RUNNING some are 
FINISHED and some are FAILED. However when I open the details for the RUNNING 
tasks they too have a task state of TASK_FINISHED. None of them is in state 
TASK_RUNNING.



> Orphan tasks shown as RUNNING are actually FINISHED
> ---------------------------------------------------
>
>                 Key: MESOS-5930
>                 URL: https://issues.apache.org/jira/browse/MESOS-5930
>             Project: Mesos
>          Issue Type: Bug
>          Components: master
>    Affects Versions: 1.0.0
>            Reporter: Lukas Loesche
>         Attachments: Screen Shot 2016-07-29 at 19.23.49.png, Screen Shot 
> 2016-07-29 at 19.24.03.png, orphan-running.txt
>
>
> On my cluster I have 111 Orphan Tasks of which some are RUNNING some are 
> FINISHED and some are FAILED. When I open the task details for a FINISHED 
> tasks the following page shows a state of TASK_FINISHED and likewise when I 
> open a FAILED task the details page shows TASK_FAILED.
> However when I open the details for the RUNNING tasks they all have a task 
> state of TASK_FINISHED. None of them is in state TASK_RUNNING.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to