Michael Gummelt created MESOS-6111:
--------------------------------------
Summary: Offer cycle is undocumented
Key: MESOS-6111
URL: https://issues.apache.org/jira/browse/MESOS-6111
Project: Mesos
Issue Type: Task
Components: documentation
Affects Versions: 1.0.1
Reporter: Michael Gummelt
cc [~neilc]
AFAICT, the "offer cycle" in Mesos is undocumented. As it has been explained
to me, the master will send on offer to a successive list of frameworks ordered
by DRF, with a 1s gap in between each offer. And when the decline timeout
(default 5s) is reached, it will start over at the beginning of the list. This
means that, by default, all other frameworks other than the first 5 in DRF
ordering will be starved.
I'm going to submit a separate JIRA with a proposal to fix this, but at the
very least, we should document the above behavior.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)