[ 
https://issues.apache.org/jira/browse/METRON-1004?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16068823#comment-16068823
 ] 

ASF GitHub Bot commented on METRON-1004:
----------------------------------------

Github user merrimanr commented on the issue:

    https://github.com/apache/metron/pull/624
  
    Was also able to successfully run all integration tests and verified full 
dev works.  
    
    The latest travis failure is an intermittent Kafka failure that I've seen 
before.  Was this an issue before or did a change in this PR cause that?  I'm 
inclined to think it's the former.


> Travis CI - Job Exceeded Maximum Time Limit
> -------------------------------------------
>
>                 Key: METRON-1004
>                 URL: https://issues.apache.org/jira/browse/METRON-1004
>             Project: Metron
>          Issue Type: Bug
>            Reporter: Nick Allen
>             Fix For: Next + 1
>
>
> Most Travis CI jobs are failing with the following error message.
> bq. The job exceeded the maximum time limit for jobs, and has been terminated.
> Travis apparently has a hard 50 minute limit that will cause jobs to timeout. 
>  
> https://docs.travis-ci.com/user/customizing-the-build#Build-Timeouts
> There is some additional time for setting up the container that is counted in 
> this hard 50 minute limit that is not reported in the UI.  So even if a build 
> says it took 44 minutes with a timeout, it likely in fact did hit the 50 
> minute limit.
> Here are some examples of these failures.
> * https://travis-ci.org/apache/metron/builds/244574987
> * https://travis-ci.org/apache/metron/builds/244552768
> * https://travis-ci.org/apache/metron/builds/241249480
> This is a separate issue from the "Storm slots didn't shut down" issue that 
> is tracked in a separate PR.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to