Matt Foley reassigned METRON-1020:
----------------------------------

    Assignee: Matt Foley

> minor changes to release process
> --------------------------------
>
>                 Key: METRON-1020
>                 URL: https://issues.apache.org/jira/browse/METRON-1020
>             Project: Metron
>          Issue Type: Improvement
>            Reporter: Matt Foley
>            Assignee: Matt Foley
>
> The following proposed changes are not just editorial in nature, hence will 
> request vote of the community to change.  Regarding the process at 
> https://cwiki.apache.org/confluence/display/METRON/Release+Process :
> * Add a step to tag the final release, as 
> "apache-metron-<finalversion>-release".
> * The current policy says that when a critical release is urgently needed, 
> "the 72 hour waiting periods in Steps 7 and 8 can be waived."  The formerly 
> referenced Step 8 was for the Incubator vote, so that can be removed as an 
> editorial issue, but we should also allow for not waiting for mirror 
> propagation -- let the mirrors catch up as fast as they can.  So the text 
> should now read:  "the 72 hour waiting period in Step 7 and the wait for 
> mirror propagation in Step 10 can be waived."
> * Finally, it is good practice to increment the build version in POMs 
> immediately AFTER a release, so that builds with new stuff cannot be mistaken 
> for builds of the release version.  The current policy says to increment it 
> just BEFORE a release.  I suggest changing this to say:
> ** immediately after a release, increment the MINOR version number (eg, with 
> the 0.4.0 just released, set the new version number to 0.4.1)
> ** immediately before a release, decide whether it will be a minor or major 
> release.  If minor, assure that the minor version number was already 
> incremented after the last release and continue to use that number.  If 
> major, change the version number to the desired new major version.
> ** These version number changes are in master branch.  Creation of new 
> branches does not occur until the idea of creating a maintenance branch or a 
> new release branch has been consented by the community.



--