Timea Barna created NIFI-12506:
----------------------------------

             Summary: /nifi-api/flow/metrics endpoint times out if flow is big
                 Key: NIFI-12506
                 URL: https://issues.apache.org/jira/browse/NIFI-12506
             Project: Apache NiFi
          Issue Type: Bug
            Reporter: Timea Barna
            Assignee: Timea Barna


If a flow is relatively big 10K processors /nifi-api/flow/metrics endpoint 
times out if nifi.analytics.predict.enabled set to true as gathering 
predictions takes long.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to