[
https://issues.apache.org/jira/browse/NIFI-16288?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Pierre Villard resolved NIFI-16288.
-----------------------------------
Fix Version/s: 2.12.0
Resolution: Fixed
> Connector stop hangs when managed Controller Services are stuck in ENABLING
> ---------------------------------------------------------------------------
>
> Key: NIFI-16288
> URL: https://issues.apache.org/jira/browse/NIFI-16288
> Project: Apache NiFi
> Issue Type: Bug
> Components: Core Framework
> Reporter: Mark Payne
> Assignee: Mark Payne
> Priority: Major
> Fix For: 2.12.0
>
> Time Spent: 1.5h
> Remaining Estimate: 0h
>
> If a connector's managed Controller Services get stuck in {{ENABLING}} (for
> example, {{LifecycleFailureService}} with a high failure count), stopping the
> connector does not complete. The connector stays in {{STOPPING}} and may
> never reach {{STOPPED}}, and the services can remain {{ENABLING}}.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)