[ 
https://issues.apache.org/jira/browse/OPENNLP-1848?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Martin Wiesner updated OPENNLP-1848:
------------------------------------
    Description: 
Note from the change log of Morfologik:
{quote}Require Java 21 for compiling the project. The output jar remains Java 
11 compatible.
{quote}
Therefore, this version is _not_ compatible with Java 8 and opennp-1.x 
maintenance branch

  was:
Note from the change log of Morfologik:

> Require Java 21 for compiling the project. The output jar remains Java 11 
>compatible.

Therefore, this version is _not_ compatible with Java 8 and opennp-1.x 
maintenance branch


> Update Morfologik to 2.2.0
> --------------------------
>
>                 Key: OPENNLP-1848
>                 URL: https://issues.apache.org/jira/browse/OPENNLP-1848
>             Project: OpenNLP
>          Issue Type: Dependency upgrade
>    Affects Versions: 2.5.9, 3.0.0-M3
>            Reporter: Martin Wiesner
>            Assignee: Martin Wiesner
>            Priority: Minor
>             Fix For: 2.5.10, 3.0.0-M4
>
>          Time Spent: 20m
>  Remaining Estimate: 0h
>
> Note from the change log of Morfologik:
> {quote}Require Java 21 for compiling the project. The output jar remains Java 
> 11 compatible.
> {quote}
> Therefore, this version is _not_ compatible with Java 8 and opennp-1.x 
> maintenance branch



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to