https://issues.apache.org/ooo/show_bug.cgi?id=123178
Bug ID: 123178
Issue Type: DEFECT
Summary: Time values not adding up correctly
Product: Calc
Version: 4.0.0
Hardware: PC
OS: Windows XP
Status: UNCONFIRMED
Severity: minor
Priority: P3
Component: editing
Assignee: [email protected]
Reporter: [email protected]
CC: [email protected]
Created attachment 81444
--> https://issues.apache.org/ooo/attachment.cgi?id=81444&action=edit
See above in the description...straight forward.
See the attachment: This is a simple time sheet that I have been using for more
than two years. It has two weeks of data. The time is entered in hours and
minutes. One of the weeks added up correctly and the other did not. The format
for the cells has not changed. I have used this sheet a couple of times since I
put in release 4.0.0.
What could cause this. By the way, I took a fresh copy of the master for this
sheet and put in the same data...same result so that it is not a one in a
million I/O error or dirty hard drive sector.
...Howard
--
You are receiving this mail because:
You are on the CC list for the bug.
You are the assignee for the bug.
You are watching all bug changes.