[ 
https://issues.apache.org/jira/browse/HDDS-5226?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Aravindan Vijayan updated HDDS-5226:
------------------------------------
    Status: Patch Available  (was: Open)

> Do not fail SCM HA pre-finalize validation if SCM HA was already being used
> ---------------------------------------------------------------------------
>
>                 Key: HDDS-5226
>                 URL: https://issues.apache.org/jira/browse/HDDS-5226
>             Project: Apache Ozone
>          Issue Type: Sub-task
>            Reporter: Ethan Rose
>            Assignee: Ethan Rose
>            Priority: Major
>              Labels: pull-request-available
>
> SCM HA has been merged in to the master branch before the upgrade framework. 
> With the current implementation of SCM HA pre-finalize validation (which 
> prevents the new feature from being used until the cluster is finalized) 
> users who follow the Apache releases and those who incrementally pull from 
> master will have different experiences when they get the upgrade framework:
> For users following official Ozone releases, the upgrade framework and SCM HA 
> will land in the same release. SCM HA  should not be allowed in pre-finalize 
> so that these users can downgrade using the upgrade framework. This is 
> currently how the validation action works.
> For users who pull from master and are already using SCM HA, the current 
> pre-finalize validation will fail to start the SCM until they turn off SCM 
> HA. The cluster must be finalized, and then SCM HA can be re-enabled. This 
> may be surprising and inconvenient.
> To support both use cases, the SCM HA pre-finalize validation action should 
> not fail if SCM HA was already being used before the upgrade.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to