[
https://issues.apache.org/jira/browse/HDDS-17537?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Attila Doroszlai updated HDDS-17537:
------------------------------------
Status: Patch Available (was: Open)
> Replace per-commit build on master with scheduled one
> -----------------------------------------------------
>
> Key: HDDS-17537
> URL: https://issues.apache.org/jira/browse/HDDS-17537
> Project: Apache Ozone
> Issue Type: Sub-task
> Components: CI
> Reporter: Attila Doroszlai
> Assignee: Attila Doroszlai
> Priority: Major
> Labels: pull-request-available
>
> Ozone CI runs for 1-1.5 hours. Waiting for a completed run on master helps
> with caching, but:
> - easy to be unaware and merge too soon
> - time-of-check vs. time-of-use (merge) problem (race condition between
> merges by individual committers)
> - creates hard limit on number of commits that can be merged in 24h
> I propose to drop the per-commit build on {{master}}, replace it with a
> periodic build every 3-4 hours. Developers would then base their work on the
> commit with the green check, ignoring later, unchecked commits on {{master}}
> for their dev branch.
> CC [~ivandika]
--
This message was sent by Atlassian Jira
(v10.3.26#10030026)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]