Chi-Hsuan Huang created HDDS-17812:
--------------------------------------
Summary: Speed up integration tests waiting for closed pipelines
to be scrubbed
Key: HDDS-17812
URL: https://issues.apache.org/jira/browse/HDDS-17812
Project: Apache Ozone
Issue Type: Improvement
Components: test
Reporter: Chi-Hsuan Huang
Since HDDS-9479, a closed pipeline stays in CLOSED state until the scrubber
deletes it after {{ozone.scm.pipeline.destroy.timeout}}. Tests that wait for
the pipeline to go away got the same config block: close container wait 2s,
scrub interval 2s, destroy timeout 5s. This block is now in 11 integration test
classes.
Each such wait takes up to about 7 seconds. For example, every decommission or
maintenance in {{TestDecommissionAndMaintenance}} waits for the node's
pipelines to be scrubbed before moving on.
Changing the block to 1s / 1s / 2s keeps the destroy timeout longer than the
close container wait, as HDDS-9479 intended. Local run time:
|| ||Before||After||
|TestDecommissionAndMaintenance|273-284s|238s|
|TestReplicationManagerIntegration|166-172s|141s|
|TestContainerStateMachineFailures|96-104s|91s|
--
This message was sent by Atlassian Jira
(v10.3.26#10030026)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]