[ 
https://issues.apache.org/jira/browse/HDDS-7726?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Attila Doroszlai updated HDDS-7726:
-----------------------------------
    Status: Patch Available  (was: In Progress)

> EC: Enhance datanode reconstruction log message
> -----------------------------------------------
>
>                 Key: HDDS-7726
>                 URL: https://issues.apache.org/jira/browse/HDDS-7726
>             Project: Apache Ozone
>          Issue Type: Sub-task
>            Reporter: Stephen O'Donnell
>            Assignee: Attila Doroszlai
>            Priority: Major
>              Labels: pull-request-available
>
> I noticed the log message for the EC reconstruction commands on the datanodes 
> looks like:
> {code}
> 2023-01-04 23:57:41,092 INFO 
> org.apache.hadoop.ozone.container.ec.reconstruction.ECReconstructionCoordinatorTask:
>  Completed the EC reconstruction of the container 1
> {code}
> It would be useful if this log message also included the indexes and target 
> DNs it has reconstructed, and perhaps the time it took to do the 
> reconstruction task. Alternative a "starting reconstruction" would let us 
> work out the time, but it would be more noise having 2 log messages rather 
> than 1.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to