[ 
https://issues.apache.org/jira/browse/HDDS-8230?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

ASF GitHub Bot updated HDDS-8230:
---------------------------------
    Labels: pull-request-available  (was: )

> Let ReplicationManager decide the timeout for commands in Datanodes
> -------------------------------------------------------------------
>
>                 Key: HDDS-8230
>                 URL: https://issues.apache.org/jira/browse/HDDS-8230
>             Project: Apache Ozone
>          Issue Type: Sub-task
>          Components: SCM
>            Reporter: Siddhant Sangwan
>            Assignee: Stephen O'Donnell
>            Priority: Major
>              Labels: pull-request-available
>
> Right now, "hdds.scm.replication.command.deadline.factor" is a fraction. For 
> long durations such as 60 minutes, the difference between SCM deadline and 
> Datanode deadline will be 60 - 60 * 0.9, which is 6 minutes. This is a 
> significant difference, so perhaps this configuration should be a duration 
> instead, like 30 seconds.
> Currently the APIs provided by RM expose the DN deadline as a parameter. We 
> could remove this and just let the RM decide a deadline for commands in the 
> DN.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to