[
https://issues.apache.org/jira/browse/HDDS-8230?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
ASF GitHub Bot updated HDDS-8230:
---------------------------------
Labels: pull-request-available (was: )
> Let ReplicationManager decide the timeout for commands in Datanodes
> -------------------------------------------------------------------
>
> Key: HDDS-8230
> URL: https://issues.apache.org/jira/browse/HDDS-8230
> Project: Apache Ozone
> Issue Type: Sub-task
> Components: SCM
> Reporter: Siddhant Sangwan
> Assignee: Stephen O'Donnell
> Priority: Major
> Labels: pull-request-available
>
> Right now, "hdds.scm.replication.command.deadline.factor" is a fraction. For
> long durations such as 60 minutes, the difference between SCM deadline and
> Datanode deadline will be 60 - 60 * 0.9, which is 6 minutes. This is a
> significant difference, so perhaps this configuration should be a duration
> instead, like 30 seconds.
> Currently the APIs provided by RM expose the DN deadline as a parameter. We
> could remove this and just let the RM decide a deadline for commands in the
> DN.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]