[ 
https://issues.apache.org/jira/browse/HDDS-8332?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Stephen O'Donnell resolved HDDS-8332.
-------------------------------------
    Resolution: Won't Fix

Yea, it is not so simple to have a dynamic limit, and we are not sure if it 
will be needed or not until we see how things work in practice. The suggestion 
here is a good idea how, but for now, I think we can close this Jira and 
revisit in the future if there is a need to improve upon the static factor.

> ReplicationManager: Use EC config scheme to adjust the weighting of 
> reconstruction tasks
> ----------------------------------------------------------------------------------------
>
>                 Key: HDDS-8332
>                 URL: https://issues.apache.org/jira/browse/HDDS-8332
>             Project: Apache Ozone
>          Issue Type: Sub-task
>          Components: SCM
>            Reporter: Stephen O'Donnell
>            Priority: Major
>
> In the comment 
> https://github.com/apache/ozone/pull/4496#pullrequestreview-1365079519 it was 
> suggest that rather than having a fixed weight applied to reconstruction 
> task, it may be better to use the EC scheme instead. As this still need some 
> thought, rather than doing in this that PR we have create this Jira to track 
> it.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to