[ 
https://issues.apache.org/jira/browse/HDDS-9039?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Hemant Kumar updated HDDS-9039:
-------------------------------
    Description: 
As part of jira: [HDDS-9004|https://issues.apache.org/jira/browse/HDDS-9004] 
and [PR|https://github.com/apache/ozone/pull/5070], we added wait/notify to 
synchronize the tarball creation with Rocks compaction. (Basically not to 
append compaction log if tarball creation is in progress). A basic integration 
test was added to verify that the tarball request count reaches to zero after 
tarball finishes. But it doesn't do end to end testing.

This task is to add integration test for tarball creation with Rocks compaction 
synchronization. 

  was:
As part of jira: [HDDS-9004|https://issues.apache.org/jira/browse/HDDS-9004]and 
[PR|https://github.com/apache/ozone/pull/5070], we added wait/notify to 
synchronize the tarball creation with Rocks compaction. (Basically not to 
append compaction log if tarball creation is in progress). A basic integration 
test was added to verify that the tarball request count reaches to zero after 
tarball finishes. But it doesn't do end to end testing.

This task is to add integration test for tarball creation with Rocks compaction 
synchronization. 


> Write tests for tarball creation and compaction synchronization
> ---------------------------------------------------------------
>
>                 Key: HDDS-9039
>                 URL: https://issues.apache.org/jira/browse/HDDS-9039
>             Project: Apache Ozone
>          Issue Type: Sub-task
>            Reporter: Hemant Kumar
>            Priority: Major
>
> As part of jira: [HDDS-9004|https://issues.apache.org/jira/browse/HDDS-9004] 
> and [PR|https://github.com/apache/ozone/pull/5070], we added wait/notify to 
> synchronize the tarball creation with Rocks compaction. (Basically not to 
> append compaction log if tarball creation is in progress). A basic 
> integration test was added to verify that the tarball request count reaches 
> to zero after tarball finishes. But it doesn't do end to end testing.
> This task is to add integration test for tarball creation with Rocks 
> compaction synchronization. 



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to