[ 
https://issues.apache.org/jira/browse/SPARK-6088?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Kay Ousterhout updated SPARK-6088:
----------------------------------
    Description: 
There are three issues when tasks get remote results:

(1) The status never changes from GET_RESULT to SUCCEEDED
(2) The time to get the result is shown as the absolute time (resulting in a 
non-sensical output that says getting the result took >1 million hours) rather 
than the elapsed time
(3) The getting result time is included as part of the scheduler delay

cc [~shivaram]

  was:
There are two issues when tasks get remote results:

(1) The status never changes from GET_RESULT to SUCCEEDED
(2) The time to get the result is shown as the absolute time (resulting in a 
non-sensical output that says getting the result took >1 million hours) rather 
than the elapsed time

cc [~shivaram]


> UI is malformed when tasks fetch remote results
> -----------------------------------------------
>
>                 Key: SPARK-6088
>                 URL: https://issues.apache.org/jira/browse/SPARK-6088
>             Project: Spark
>          Issue Type: Bug
>          Components: Web UI
>            Reporter: Kay Ousterhout
>            Assignee: Kay Ousterhout
>         Attachments: Screenshot 2015-02-28 18.24.42.png
>
>
> There are three issues when tasks get remote results:
> (1) The status never changes from GET_RESULT to SUCCEEDED
> (2) The time to get the result is shown as the absolute time (resulting in a 
> non-sensical output that says getting the result took >1 million hours) 
> rather than the elapsed time
> (3) The getting result time is included as part of the scheduler delay
> cc [~shivaram]



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to