[
https://issues.apache.org/jira/browse/SPARK-40586?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17642120#comment-17642120
]
Rui Wang commented on SPARK-40586:
----------------------------------
Contributions are welcome!
> Decouple plan transformation and validation on server side
> -----------------------------------------------------------
>
> Key: SPARK-40586
> URL: https://issues.apache.org/jira/browse/SPARK-40586
> Project: Spark
> Issue Type: Sub-task
> Components: Connect
> Affects Versions: 3.4.0
> Reporter: Rui Wang
> Priority: Major
>
> Project connect, from some perspectives, can be thought as replacing the SQL
> parser to generate a parsed (but the difference that is unresolved) plan,
> then the plan is passed to the analyzer. This means that connect should also
> do validation on the proto as there are many in-validate parser cases that
> analyzer does not expect to see, which potentially could cause problems if
> connect only pass through the proto (of course have it translated) to
> analyzer.
> Meanwhile I think this is a good idea to decouple the validation and
> transformation so that we have two stages:
> stage 1: proto validation. For example validate if necessary fields are
> populated or not.
> stage 2: transformation, which convert the proto to a plan with assumption
> that the plan is valid parsed version of the plan.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]