[
https://issues.apache.org/jira/browse/SYSTEMML-2482?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
LI Guobao updated SYSTEMML-2482:
--------------------------------
Description: Some unexpected overhead occurred when running the
{{*testParamservASPEpochDisjointContiguous*}} in test
{{*org.apache.sysml.test.integration.functions.paramserv.ParamservSparkNNTest*}}.
It took more time to finish the test in the case that the output of
instruction is a list which will be cleaned up after the execution. (was: Some
unexpected overhead occurred when running the
{{testParamservASPEpochDisjointContiguous}} in test
{{org.apache.sysml.test.integration.functions.paramserv.ParamservSparkNNTest}}.
It took more time to finish the test in the case that the output of instruction
is a list which will be cleaned up after the execution.)
> Unexpected cleanup of list object
> ---------------------------------
>
> Key: SYSTEMML-2482
> URL: https://issues.apache.org/jira/browse/SYSTEMML-2482
> Project: SystemML
> Issue Type: Bug
> Reporter: LI Guobao
> Priority: Major
>
> Some unexpected overhead occurred when running the
> {{*testParamservASPEpochDisjointContiguous*}} in test
> {{*org.apache.sysml.test.integration.functions.paramserv.ParamservSparkNNTest*}}.
> It took more time to finish the test in the case that the output of
> instruction is a list which will be cleaned up after the execution.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)