Bikas Saha commented on TEZ-1750:
---------------------------------

the new configuration should be an expert level setting and probably unstable.

yes. From the naming of the method it seems that it should already have 
scheduled if the vertex scheduling trigger has been reached. wasnt clear why is 
was just returning a boolean and letting the called do the scheduling.

Any ideas about the 1-1 edge handling or custom edge handling? Or are they 
follow up items to be done after trying this out in experiments?

> Add a DAGScheduler which schedules tasks only when sources have been scheduled
> ------------------------------------------------------------------------------
>
>                 Key: TEZ-1750
>                 URL: https://issues.apache.org/jira/browse/TEZ-1750
>             Project: Apache Tez
>          Issue Type: Improvement
>            Reporter: Siddharth Seth
>            Assignee: Siddharth Seth
>            Priority: Critical
>         Attachments: TEZ-1750.1.txt, TEZ-1750.2.txt
>
>
> Splitting out the patch on TEZ-1522 into a separate jira.
> There's several scenarios in which we end up scheduling downstream tasks 
> before their sources have been scheduled - and then get into a situation 
> where the sources are starved. Currently, anywhere a ShuffleVertexManager is 
> used can cause such behaviour - since it starts scheduling it's tasks after a 
> certain number of sources are complete, but subsequen non-shuffle 
> VertexManagers will scheduled immediately.
> Disabling slow-start is one option to achieve this (or setting slow start on 
> all vertices), but it doesn't work for the situation where dynamic reducer 
> parallelism kicks in - since it has to wait for source tasks to complete.
> The intent here is to add a DAGScheduler, which affectively negates the slow 
> start, and in case of dynamic parallelism determination, waits for upstream 
> tasks to be scheduled before scheduling downstream tasks.



--
This message was sent by Atlassian JIRA