Siddharth Seth edited comment on TEZ-1750 at 11/8/14 8:52 PM:
--------------------------------------------------------------

Updated with expert level setting.

There's comments in their on some future enhancements - considering cluster 
capacity to allow scheduling downstream even if upstream is not scheduled, 
generic slow start.

Not enabling this by default in 0.5.3, because I think it's not a good change 
to have in place on a minor version. On 0.6.0, based on how this performs, it 
could be enabled by default.


was (Author: sseth):
Updated with experimental.

There's comments in their on some future enhancements - considering cluster 
capacity to allow scheduling downstream even if upstream is not scheduled, 
generic slow start.

Not enabling this by default in 0.5.3, because I think it's not a good change 
to have in place on a minor version. On 0.6.0, based on how this performs, it 
could be enabled by default.

> Add a DAGScheduler which schedules tasks only when sources have been scheduled
> ------------------------------------------------------------------------------
>
>                 Key: TEZ-1750
>                 URL: https://issues.apache.org/jira/browse/TEZ-1750
>             Project: Apache Tez
>          Issue Type: Improvement
>            Reporter: Siddharth Seth
>            Assignee: Siddharth Seth
>            Priority: Critical
>         Attachments: TEZ-1750.1.txt, TEZ-1750.2.txt, TEZ-1750.3.txt
>
>
> Splitting out the patch on TEZ-1522 into a separate jira.
> There's several scenarios in which we end up scheduling downstream tasks 
> before their sources have been scheduled - and then get into a situation 
> where the sources are starved. Currently, anywhere a ShuffleVertexManager is 
> used can cause such behaviour - since it starts scheduling it's tasks after a 
> certain number of sources are complete, but subsequen non-shuffle 
> VertexManagers will scheduled immediately.
> Disabling slow-start is one option to achieve this (or setting slow start on 
> all vertices), but it doesn't work for the situation where dynamic reducer 
> parallelism kicks in - since it has to wait for source tasks to complete.
> The intent here is to add a DAGScheduler, which affectively negates the slow 
> start, and in case of dynamic parallelism determination, waits for upstream 
> tasks to be scheduled before scheduling downstream tasks.



--