[
https://issues.apache.org/jira/browse/TEZ-2020?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Bikas Saha updated TEZ-2020:
----------------------------
Attachment: TEZ-2020.1.patch
> For 1-1 edge vertex configured event may be sent incorrectly
> ------------------------------------------------------------
>
> Key: TEZ-2020
> URL: https://issues.apache.org/jira/browse/TEZ-2020
> Project: Apache Tez
> Issue Type: Bug
> Reporter: Bikas Saha
> Assignee: Bikas Saha
> Attachments: TEZ-2020.1.patch
>
>
> For a fully configured 1-1 vertex configured event will be sent after init
> because the vertex manager does not signal intent to reconfigure. However a
> change in parallelism upstream on the 1-1 edge can cause this vertex's
> parallelism to be updated accordingly. This breaks the guarantee that
> configured should be sent after vertex is fully configured. This is because
> update of parallelism on 1-1 edge has until now been hard-coded in the Vertex
> code. This can be removed now with the InputReadyVertexManager handling the
> 1-1 edge and the addition of vertex state updates. Not only will this fix the
> issue but also remove the special handling for 1-1 edges in the AM which
> should not be there for cleanliness.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)