[
https://issues.apache.org/jira/browse/TEZ-2164?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Cyrille Chépélov updated TEZ-2164:
----------------------------------
Attachment: allow-guava-16.0.1.patch
While running scalding/cascading/tez workloads, the old 11.0.2 version of guava
used by tez collided with newer versions pulled by other dependencies. In
particular, the Stopwatch API has changed somewhere between guava 14.0 and
15.0, making it unpossible to build for both versions at the same time.
As other dependencies are really unhappy with guava-11.0.2, I'm running rebuilt
versions of Tez-0.6.0 with this patch for Stopwatch users. This patch requires
at least guava-15.0 in tez' pom.xml
FWIW
> Shade the guava version used by Tez
> -----------------------------------
>
> Key: TEZ-2164
> URL: https://issues.apache.org/jira/browse/TEZ-2164
> Project: Apache Tez
> Issue Type: Improvement
> Reporter: Siddharth Seth
> Priority: Critical
> Attachments: allow-guava-16.0.1.patch
>
>
> Should allow us to upgrade to a newer version without shipping a guava
> dependency.
> Would be good to do this in 0.7 so that we stop shipping guava as early as
> possible.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)